9.256 tCO₂e to date 13 deliveries
8.44 tonnes of ductwork
12.721 tCO₂e saved X-Carb steel vs standard
7.427 tCO₂e in October 2026 latest month
Month by month Material (EPD) DeliveryHover a month for figures
0 2.5 5 7.5 10 Sep 26 Oct 26
Job to date Material Delivery Total Rectangular 7.559 0.279 7.838 Spiral 1.407 0.011 1.418 Total tCO₂e 8.966 0.290 9.256
8.439 t of ductwork · 12.721 tCO₂e saved (X-Carb)
By month Month Deliveries tCO₂e Running total September 2026 4 1.830 1.830 October 2026 9 7.427 9.256
Deliveries October 2026 September 2026
Date Order Supplier Van kg Miles Material Delivery tCO₂e 07/09/2026 187033/187415/TH MAS spiral Courier 1 - Standard Luton 117.3 8.4 0.302 0.004 0.305 09/09/2026 2413-01-26 00:00:00 Island BE11 CVK 381.6 76.0 0.981 0.027 1.008 22/09/2026 187929/187922 MAS spiral FV70 EEM 186.8 8.4 0.480 0.003 0.483 26/09/2026 188122/th IDM X-Carb HN75 ACF 25.1 26.0 0.022 0.011 0.033 4 deliveries 710.8 1.784 0.045 1.830
Date Order Supplier Van kg Miles Material Delivery tCO₂e 05/10/2026 188292/joc IDM X-Carb WN26GDY 2,106.8 26.0 1.846 0.013 1.858 07/10/2026 188292/joc IDM X-Carb Courier 4 - 18 Tonne Lorry 2,086.3 26.0 1.828 0.041 1.868 09/10/2026 188571/th IDM X-Carb Courier 1 - Standard Luton 71.9 26.0 0.063 0.012 0.075 12/10/2026 188528/th IDM X-Carb Courier 4 - 18 Tonne Lorry 324.0 26.0 0.284 0.041 0.324 13/10/2026 188815/TH MAS spiral Courier 1 - Standard Luton 243.5 8.4 0.626 0.004 0.630 15/10/2026 188612/TH IDM X-Carb Courier 5 - 44 Tonne Artic Lorry 1,129.5 26.0 0.989 0.042 1.031 19/10/2026 188528/hm IDM X-Carb Courier 4 - 18 Tonne Lorry 904.1 26.0 0.792 0.041 0.833 20/10/2026 188791/188899/188656/hm IDM X-Carb Courier 1 - Standard Luton 582.8 26.0 0.511 0.012 0.523 30/10/2026 189266/th IDM X-Carb Courier 4 - 18 Tonne Lorry 278.9 26.0 0.244 0.041 0.285 9 deliveries 7,727.8 7.182 0.245 7.427
How this is worked out. Material carbon = tonnes delivered × the supplier’s EPD factor (tCO₂e per tonne). Delivery carbon = the delivery vehicle’s CO₂ per mile × the round-trip road miles from the supplier’s depot to site, once per delivery. The saving compares rectangular ductwork made from X-Carb steel with the same tonnage of standard steel. Every delivery is checked by IDSL against its delivery note before it counts. Figures are tCO₂e.